Upgrading Reclaimer Coal System from Relay Control to Siemens S7-300
23/08/2015

Upgrading Reclaimer Coal System from Relay Control to Siemens S7-300
- Hardware Engineering, Software Engineering, Installation and Commisioning.
- Provide S7 training to customer
PLC & WinCC Upgrade
23/08/2015

PLC & WinCC Upgrade
- PLC Upgrading from Fatex PLC to S7-300 for FOC Plant.
- WinCC Upgrade from WinCC version 5.0 to WinCC version 7.0
- Manufacturing Establishment System [MES] integration to existing SCADA system.
- Feeder Upgrading for Line 1 – Line 4 from Rk512 to ModBUS Communication
- Redesign the automation interface with Siemens S7 PLC
- Hardware Engineering, Software Engineering, Installation and Commissioning
PLC Upgrade for 5 unit of Press Cutting Machine
23/08/2015

PLC Upgrade for 5 unit of Press Cutting Machine
- Maintenance Contract
- Redesign the automation system with Siemens S7 PLC
- Hardware Engineering, Software Engineering, Installation and Commissioning
Upgrading BMKU Plant System from Siemens S5 to S7
23/08/2015

Upgrading BMKU Plant System from Siemens S5 to S7
- Maintenance Contract
- Reengineer the HMI System and PLC Programming.
- ProfiBUS Communication with FESTO’s pneumatics.
- Hardware Engineering, Software Engineering, Installation and Commissioning
Siemens PCS7 Automation System Upgrade
23/08/2015

Siemens PCS7 Automation System Upgrade
- Replacement of Automation System Hardware for Utility Complex
- Hardware Engineering, Software Engineering, Installation and Commissioning
Chiller Panel PLC Modification Work
23/08/2015

Chiller Panel PLC Modification Work
- Modify existing Redundant S7-300 CPU with new Analog input card
- Install New Engineering Workstation for engineering
- Install new Scada System using Siemens Wincc Flexible
Siemens PLC Troubleshooting and Standby of Drammen Carousel’s Control System
23/08/2015

Siemens PLC Troubleshooting and Standby of Drammen Carousel’s Control System
- Assist in the operation and trouble shooting of a Siemens based control system for a pipe laying carousel.
Siemens PLC Shutdown Maintenance During Turnaround
21/08/2015

Siemens PLC Shutdown Maintenance During Turnaround
- To perform complete system Backup WinCC( 2 Station) and Step 7(14system) prior to execution of the system shutdown maintenance work.
- To perform comprehensive system software/hardware diagnostics/ test and verify that the system is functioning correctly
- To provide detail report for every inspection, checks, rectification fault, problem observation, test result and recommendation
Upgrade bulk Urea Storage (Bus 2) Reclaimer Scrapper from Siemens S5 PLC to S7
21/08/2015

Upgrade bulk Urea Storage (Bus 2) Reclaimer Scrapper from Siemens S5 PLC to S7
- Upgrading Siemens Fail Safe S5-95F to Siemens S7-300F system
- Improvement of existing control philosophy
- Hardware Engineering, Software Engineering, Installation and Commisioning
UET Reclaimer Upgrade From Siemens S5 to Siemens S7
20/08/2015

UET Reclaimer Upgrade From Siemens S5 to Siemens S7
- Redesign the automation system with Siemens S7-300 PLC
- Hardware Engineering, Software Engineering, Installation and Commissioning