PLC & WinCC Upgrade
- PLC Upgrading from Fatex PLC to S7-300 for FOC Plant.
- WinCC Upgrade from WinCC version 5.0 to WinCC version 7.0
- Manufacturing Establishment System [MES] integration to existing SCADA system.
- Feeder Upgrading for Line 1 – Line 4 from Rk512 to ModBUS Communication
- Redesign the automation interface with Siemens S7 PLC
- Hardware Engineering, Software Engineering, Installation and Commissioning
Project Details
- Client BASF Pasir Gudang
- Location KT Plant, BASF Pasir Gudang, Johor
- Category PLC Software Programming