Siemens PLC Shutdown Maintenance During Turnaround

  • To perform complete system Backup WinCC( 2 Station) and Step 7(14system) prior to execution of the system shutdown maintenance work.
  • To perform comprehensive system software/hardware diagnostics/ test and verify that the system is functioning correctly
  • To provide detail report for every inspection, checks, rectification fault, problem observation, test result and recommendation
Project Details
  • Client Petronas Methanol (Labuan) Sdn Bhd
  • Location Petronas Methanol Labuan - Plant 2
  • Date 14 February 2014
  • Category PLC Software Programming