Siemens PLC Shutdown Maintenance During Turnaround
- To perform complete system Backup WinCC( 2 Station) and Step 7(14system) prior to execution of the system shutdown maintenance work.
- To perform comprehensive system software/hardware diagnostics/ test and verify that the system is functioning correctly
- To provide detail report for every inspection, checks, rectification fault, problem observation, test result and recommendation
Project Details
- Client Petronas Methanol (Labuan) Sdn Bhd
- Location Petronas Methanol Labuan - Plant 2
- Date 14 February 2014
- Category PLC Software Programming