Upgrading  Reclaimer Coal System from Relay Control to Siemens S7-300

Upgrading Reclaimer Coal System from Relay Control to Siemens S7-300 Hardware Engineering, Software Engineering,

PLC Upgrade for 5 unit of  Press Cutting Machine

PLC Upgrade for 5 unit of  Press Cutting Machine Maintenance Contract Redesign the automation

Upgrading BMKU Plant System from Siemens S5 to S7

Upgrading BMKU Plant System from Siemens S5 to S7 Maintenance Contract Reengineer the HMI

Siemens PCS7 Automation System Upgrade

Siemens PCS7 Automation System Upgrade Replacement of Automation System Hardware for Utility Complex Hardware

Siemens PLC Shutdown Maintenance During Turnaround

Siemens PLC Shutdown Maintenance During Turnaround To perform complete system Backup WinCC( 2 Station)

Upgrade bulk Urea Storage (Bus 2) Reclaimer Scrapper from Siemens S5 PLC to S7

Upgrade bulk Urea Storage (Bus 2) Reclaimer Scrapper from Siemens S5 PLC to S7

UET Reclaimer Upgrade From Siemens S5 to Siemens S7

UET Reclaimer Upgrade From Siemens S5 to Siemens S7 Redesign the automation system with

DCS Migration System for Air Separation Unit

DCS Migration System for Air Separation Unit 1 (ASU 1) from Siemens APACS-QUADLOG to

Upgrade of Siemens Electrical Network Monitoring and Control ENMC PLC S5 to PLC S7

Upgrade of Siemens Electrical Network Monitoring and Control ENMC PLC S5 to PLC S7

Flare Gas Recovery Unit (FGRU)

Flare Gas Recovery Unit (FGRU) Logic developement and design for Siemens S7-400H(Redundant) & S7-300

EPCC for 53 NOS. Relay System Upgrading From ISGS TO SIPROTEC

EPCC for 53 NOS. Relay System Upgrading From ISGS TO SIPROTEC Logic developement and

EPIC of LV Motor Upgrading from Simocode DP to Simocode Pro-V